Types
One-off assignments with a goal and a deadline are missions. They live in the same One-off tab.
How to set one up
1
Automations → Rule
Or Templates — ready-made automations, see Templates.
2
Describe it in one phrase
What to do, when, and where to send the result. There’s no form — the assistant works out the time, the condition and the sources itself.
3
Check the card
The automation page shows the task, the expected result, when it runs, quiet hours, sources and where the result goes.
Examples
Scheduled automations are in Pro and in the trial. Missions, chains and event rules work on every plan and use questions. If Pro ends, scheduled automations pause; nothing is deleted. See Plan and limits.
Change, turn off, run now
- Change — the What to change field on the automation page: “move it to 8:30”, “send it to Slack”. No form here either.
- Turn off — the switch on the card. Turn it back on with the same switch.
- Run now — in the ⋯ menu. A scheduled automation runs within a few minutes, and the result arrives in the chat. A rule or an on-demand command can’t be run this way — for those, the menu shows a hint on how to call them.
- Run history — on the automation page: date and result.